Projects

Subway – Serfaus

September 2019 In Serfaus the company Leitner has modernized the subway. This funicular, with 4 stations, is pulled by a hauling rope, and slides uniquely

3S – in Voss – Norway

May 2019 In Voss-Norway a 28-seater “Tricable Gondola Cableway” was erected from Leitner Comp. This Cableway connects the city of Voss with the famous existing

Tamoios – Brazil

March 2019 In the tropical rainforest between Sao Paolo and Rio de Janeiro a material cableway was set up from LCS Comp. with a payload

3S – in Zermatt

September 2018 The Queen of Cableways (3S) meets the King of Mountains (Matterhorn) In Zermatt (Switzerland) facing the famous mountain Matterhorn a 28-seater “Tricable Gondola

Trabzon – Bezikduzu – Turkey

February 2018 In Bezikduzu in the area of Trabzon on the Black Sea Coast of Turkey a “Jig-Back” Ropeway was erected by Leitner. This Ropeway

Kvietfjell – Norway

January 2018: In Kvietfjell near Lillehammer in Norway “Group-Reversible-Ropeway” was erected by Leitner. A special technical feature of this Ropeway is a “full automatic operation”

Ardahan – Anatolia – Turkey

November 2017: In Ardahan in the northeast of Turkey (Anatolia) a 4-seater Chairlift was erected by Leitner. This Chairlift was built with development support from

Alanya – Turkey

July 2017: In Alanya in the south of Turkey an 8-seater Gondola Ropeway was erected by Leitner. This Ropeway is leading from the beach up

Singapore – Sentosa Island

July 2017: On the leisure island Sentosa in Singapore a 4-seater Chairlift was erected by Doppelmayr. The chairs are equiped with a “Cart hook system”